TR30 CLC Foaming Machine Concrete Foam Generator
The purchasing pace at the demand end of the international thermal coal market continues to slow down and the international thermal coal price continues to decline. Prices for thermal coal at major international ports continued to fall last week as buyers in Europe slowed in recent days for April, coupled with weaker-than-expected import demand from End users in China. According to China Coal Market net monitoring: Australia Newcastle port thermal coal price index was 253 USD/ton, compared with 309.02 USD/ton, down 56.02 USD/ton, down 18.13%. South Africa's Port Richards thermal coal price Index was $264.5 / mt, down the US $62.72 / mt or 19.17% from US $327.22 / mt. The European ARA Tri-port thermal coal price Index was $281.8 / ton. Does the price of thermal coal in major international ports continue to decline to affect the price of the Concrete Foaming Generator?
Description of TR30 foam generator
Foam Concrete Machine is the core equipment of foam concrete production, which has a significant impact on the quality of foam concrete. An excellent foam generator for concrete not only has a high foam output but more importantly, the quality of the foam produced is outstanding. TR30 foam generator developed by our company. It can be used in laboratories, small-scale foam concrete cast-in-situ projects, and pilot lines of foam concrete products. The outstanding advantages of TR30 foam generator are low foam moisture content, more foaming agent, high foam uniformity, large foam output, and other benefits.
Parameters of TR30 foam generator
Model | TR30 |
Maximum foam output(m3/h) | 8 |
Motor voltage(V) | 220 |
Work rate(W) | 1500 |
Pump suction(m) | 1-3 |
Dimensions(cm) | 120*50*90 |
Weight(kg) | 120 |
Usually need to be disassembled:
1. After working for a long time, it is found that the foam shape is not good, usually more than three months.
2. Pipe blockage: Some foaming agent remaining in the bubble tube will form a solid residue. In this case, the foam cannot be produced normally, or the pipeline pressure increases sharply. At this time, all the old steel balls need to be taken out, and then replaced with a new one The ball is fine. Steel wire ball specification requirements: each blowing tube needs to be filled with about 12-15 steel wire balls. Too much or too little will affect or even destroy the foam performance.
Precautions:
1. Remember to use electricity safely. If water or foam touches the circuit, you must immediately cut off the power at the remote end to ensure safe production.
2. There will be air in the pipeline when it is used for the first time. The foaming liquid has not been pumped into the equipment in a short time. You can wait for tens of seconds until the liquid is filled with the entire suction tube and the foaming operation can be performed normally.
3. Do not start the equipment when the pipeline is blocked to prevent damage to the components due to overpressure in the pipeline.
If you are looking for foam generator please feel free to contact us and send an inquiry, email address: sales@cabr-concrete.com
Model: TR30
Maximum foam output(m3/h): 7.5
Motor voltage(V) : 220
Work rate(KW): 3
Foaming speed(L/m): 120
Bubble bleeding(kg/m3): 46
Dimensions(cm): 120*50*90
Weight(kg): 120
Europe's immediate goal of reducing its dependence on Russian gas in response to the conflict with Ukraine presents a rare opportunity for the United States, the world's largest gas producer. America's LNG exporters have made a fortune this time. Investors are bullish on the future of natural gas, as evidenced by the recent record high share price of Energy company Chenier.
But the outlook for more than a dozen new LNG projects is highly uncertain as construction costs rise, US gas prices soar and climate policymakers seek to move away from a long-term reliance on fossil fuels. Even the most advanced projects can take years to become operational.
Currently, the total U.S. LNG Concrete Foaming Generator are expected to continue to rise in the future.
Inquiry us